Client
Client
Reeds Spring School District
Project Type
Project Type
K-12
Year Completed
Year Completed
2023
Scope
Scope
80,000 SF / $14.9M Project Cost
Reeds Springs School District’s primary school required significant upgrades due to the age of its facilities. Many portions of the existing building, particularly the mechanical, electrical, and plumbing systems, had exceeded their expected service life. True Engineering collaborated with the architect and the district to modernize all mechanical, electrical, and plumbing components within the building.
A state-of-the-art water source heat pump system was installed, including a new cooling tower, boiler, pumps, and piping distributed throughout the facility. All classrooms, both existing and new, were equipped with individual heat pump terminal units for personalized climate control. In addition, the building was outfitted with a new building automation system designed to enhance occupant comfort. The electrical infrastructure was comprehensively upgraded with new panels, lighting, and life safety systems. Through these enhancements, True Engineering successfully transformed an outdated facility into a modern, advanced primary school for the district.
Reeds Springs School District’s primary school required significant upgrades due to the age of its facilities. Many portions of the existing building, particularly the mechanical, electrical, and plumbing systems, had exceeded their expected service life. True Engineering collaborated with the architect and the district to modernize all mechanical, electrical, and plumbing components within the building.
A state-of-the-art water source heat pump system was installed, including a new cooling tower, boiler, pumps, and piping distributed throughout the facility. All classrooms, both existing and new, were equipped with individual heat pump terminal units for personalized climate control. In addition, the building was outfitted with a new building automation system designed to enhance occupant comfort. The electrical infrastructure was comprehensively upgraded with new panels, lighting, and life safety systems. Through these enhancements, True Engineering successfully transformed an outdated facility into a modern, advanced primary school for the district.








Site by
GET IN TOUCH
417.708.7025
nelson@true-mep.com
Site by
Site by
Site by