McGregor Elementary HVAC Upgrade

Client

Springfield Schools

Project Value

$1.6M

Square Footage

41,000

Client

Springfield Schools

Project Value

$1.6M

Square Footage

41,000

Performed design engineering for a full HVAC system replacement for a complete elementary school. The outdated and system was failing and required frequent repairs. The replacement HVAC systems included new variable refrigerant flow (VRF) coupled with dedicated outside air units (DOAS) for classrooms, offices, and library. The multipurpose gymnasium featured a dedicated packaged rooftop unit. The project required extensive ductwork modification for the new HVAC system type with compressed construction schedule. True Engineering Group also served as a project management consultant and performed commissioning.

Performed design engineering for a full HVAC system replacement for a complete elementary school. The outdated and system was failing and required frequent repairs. The replacement HVAC systems included new variable refrigerant flow (VRF) coupled with dedicated outside air units (DOAS) for classrooms, offices, and library. The multipurpose gymnasium featured a dedicated packaged rooftop unit. The project required extensive ductwork modification for the new HVAC system type with compressed construction schedule. True Engineering Group also served as a project management consultant and performed commissioning.

Site by

GET IN TOUCH

417.708.7025

nelson@true-mep.com

Site by

Site by

Site by