After the elementary school’s existing air-cooled chiller failed, leaving the building without cooling, Springfield Public Schools engaged True Engineering to reevaluate the required chiller capacity and develop a rapid replacement solution before school began in August 2026.
True Engineering recalculated the HVAC loads, reducing the required equipment tonnage by 20%, and corrected the pumping system operation to lower the building’s energy costs. The project was completed well before staff and teachers returned to prepare for the school year.
After the elementary school’s existing air-cooled chiller failed, leaving the building without cooling, Springfield Public Schools engaged True Engineering to reevaluate the required chiller capacity and develop a rapid replacement solution before school began in August 2026.
True Engineering recalculated the HVAC loads, reducing the required equipment tonnage by 20%, and corrected the pumping system operation to lower the building’s energy costs. The project was completed well before staff and teachers returned to prepare for the school year.